POWERBANK · COMING Q1 2027

The PowerBank
arrives.

A 250 kWh mobile battery platform with a 500 kVA inverter, built to take tower-crane, welder, and HVAC surge loads on the pack alone. Class 1 Div 2 at launch. First refusal is open now to a select group of rental partners and operators.

Specifications are engineering targets validated against OGI's internal build specification and independent chemistry literature, pending prototype validation Q1 2027.

PRE-LAUNCH UNITQ1 · 2027
PowerBank mobile battery energy storage unit
PEAK POWER500kVA
10 × 8 × 9.5 FTCLASS 1 DIV 2 · AT LAUNCH
ENERGY250 kWh

Mobile pack capacity

RECHARGE2C

30% to 100% in 30 minutes

CYCLE TARGET10,000

To 80% state of health

DISCHARGE−40 · +60 °C

Target operating range

THE DIFFERENCE IS
WHAT'S INSIDE.

Same trailer footprint.
A different power class.

Every 250 kWh LFP competitor needs a genset in parallel to absorb major startup loads. The PowerBank targets 500 kVA from the inverter itself, giving demanding equipment the surge it needs while the generator stays in its efficient recharge window.

ENGINEERING BENCHMARK

PowerBank vs.
the LFP tier

Published competitor specifications beside OGI's internal engineering targets. Same mobile-BESS vocabulary, meaningfully different performance.

SPECIFICATION MATRIXOGI TARGETS · PENDING Q1 2027 VALIDATION
SpecificationPOWR2
M250.500
Atlas Copco
ZBC500
Generac
SBE500
PowerBank
OGI
ChemistryLFPLFPLFPNext-gen chemistry
Cycle life to 80% SOH~6,000*6,000~6,000*10,000†
Sustained recharge0.5C0.5C0.5C2C
30% → 100% recharge1–2 hr1–2 hr1–2 hr30 min
Hazardous-location ratingUL/CSA onlyUL/CSA onlyUL/CSA onlyClass 1 Div 2at launch
Discharge temperature−20 · +50 °C−20 · +50 °C−20 · +50 °C−40 · +60 °C‡
Envelope L × W × H10 × 8 × 8.5 ft9.8 × 8 × 9.5 ft10 × 8 × 9.6 ft10 × 8 × 9.5 ft
Competitor figures published in vendor datasheets: POWR2 M-series, Atlas Copco ZBC500-250, and Generac SBE. PowerBank targets confirmed against OGI internal engineering specification, 6 August 2026, pending prototype validation Q1 2027. *POWR2/Generac cycle life is industry-typical for LFP mobile BESS and is not independently sourced to a public datasheet. †OGI internal engineering target. ‡Discharge range; confirmed charge-temperature specification is pending prototype validation.
FIRST REFUSAL · SELECT PARTNERS

Get in front of
the Q1 2027 launch.

Tell us where you deploy, what you run, and how many units you may need. We’ll start the engineering conversation now.

Reserve first refusal →